REKLAMA
Poland

Shelter point markings: who must install them by 31 December

Owners, administrators or users of buildings where the State Fire Service (PSP) has designated shelter points must mark them no later than 31 December 2026. The obligation results from a regulation of the Ministry of Interior and Administration (MSWiA), which has been in force since 30 September.

What the regulation provides

The legal basis is the regulation of the minister of internal affairs and administration of 28 September 2026 amending the rules on fire protection of buildings, structures and areas (Dz.U. 2026 poz. 1276). It was published on 29 September and entered into force on 30 September.

The catalogue of obligations of owners, administrators and users of buildings has been supplemented with the marking of shelter points referred to in Article 84a of the act of 5 December 2024 on the protection of the population and civil defence. Points identified before the provisions entered into force must be marked immediately, and no later than 31 December 2026. The obligation applies to both public and private entities. The provision to which it was added does not cover single-family residential buildings.

The owner does not designate the point independently. Shelter points are identified by the district (city) commander of the State Fire Service (PSP), who notifies the wójt, mayor or city president, the starost, and the owner or administrator of the property.

What the marking should look like

According to the annex to the regulation and information published by State Fire Service units, the marking consists of several elements:

  • on the building facade – a plate with the international civil defence sign (a blue equilateral triangle on an orange background), measuring 200 × 200 mm;
  • directly beneath it – a green plate with the white inscription “PUNKT SCHRONIENIA” (SHELTER POINT), measuring 100 × 200 mm;
  • an 80 × 80 mm sticker with the same sign in the upper right corner of the building’s entrance door and of the doors leading to the shelter point itself.

The National Headquarters of the State Fire Service (PSP) has prepared marking instructions, and fire service units are publishing a graphic template on gov.pl. The instructions recommend placing the plates on the front wall, to the right of the main entrance, and making the marking resistant to water and sunlight.

A shelter point is not the same as a shelter. Deputy Minister of the Interior Wiesław Leśniakiewicz said that shelter points are intended for peacetime, while in wartime the places are temporary shelters, shelters and hiding places.

Which places are shelter points

The act defines them as places for the temporary concealment of people that protect against sudden dangerous weather phenomena and the effects of conventional weapons, in particular shrapnel. In practice, these include underground passages, tunnels, metro stations, underground car parks and cellars, among others. They are temporary cover in a sudden threat, not a place to stay for many hours.

The locations of the points can be checked in the app and on the gdziesieukryc.pl map. In October, the fire service database included more than 86,000 such places across the country.

Do not go independently to places that have not been verified by the services. Anyone who cannot reach a point in time should take shelter in a building, behind at least two walls.

Dorota Lune

Dorota Lune, redaktorka serwisu DigitalNexus.pl. Zajmuje się tematyką show-biznesową, bieżącymi informacjami jak i ciekawostkami ze świata. Ukończyła dziennikarstwo na UPJPII w Krakowie. Wcześniej pracowała w branży turystycznej. W wolnych chwilach lubi podróżować i czytać książki.